We’re honored to partner with visionary clients who challenge us to innovate and excel.
Thermal power station with five units of 212 Mega Watt for a total of 1060 Mega Watt, 300 apartments, and 11 villas.

The project consists of execution: - The civil and electro- mechanical works of various buildings in the Power Station. - Medium Voltage system: Supply and installation of all necessary equipment for operation the MV System in the power station

Training facility, gift from the Japanese Government, for power stations workers complete with 100 room dormitory, laboratory building, main building, and workshop.

3x120 Mega Watt power station, substation, water treatment plant, supervisory building, 3 control buildings, 10 storage tanks, workshop, warehouse and workers housing.

Nader & Khaldoun Atassi executed all the Civil and Electro-Mechanical Installation works.

The project consists of 154 Room 4 Star Luxury Hotel including 10 Suites and one Royal Suite with 4 restaurants, banquet facility and shopping mall.

The project is a Power Station of 600 MW (3x212) and the consortium work consists of the Erection of: - The Substation - The Boilers - The Steam Turbine & Generation Island - The Electrical Works

Nader & Khaldoun Atassi is executing all the Construction (Civil works) and Erection (Electro-mechanical) of 150T/h Steam Boiler Pressure Reducing Station and Turbine Hall Extension.

The building is 400 m2 one story with a steel mezzanine 200 m2 area fixed to the columns the height of the building is 6.5 m The work of Nader & Khaldoun Atassi is to execute all the Civil works (including Seismic and Structural Reinforcement), Electromechanical works, Decorative, Furniture and Exte

The project is divided to two parts: - Transfer the existing Gas Turbine Power Plant of 3 x 100MW to Combined Cycle with additional capacity of 150 MW. - Workers housing of 128 flats and 3 Villas with all facilities N & K Atassi Work: - Civil & Structural Work - Site infrastructure including water a

The project is a Five Stars Resort and consists to: - A Hotel of 200 Rooms, 40 Suites and a Presidential Suite. - 42 Chalets. - Marine Tower. - Marine Protection works

The project is a Sugar Refinery of one million tons per year and the works consist of the Civil Works, Erection of Steel Structures

- 26 Villas of 350 m2 each including all decorative work on a turn key basis - 200,000 m2 land Infrastructure including complete roadways, electrical network, water network, sewage network, drainage network, and landscaping. - Service building for pumping system and water treatment. - 2.5 Km pre-cas

The work consists of the renovation of Cinema Damascus by creating new spaces: - 2 Cinemas of 500 seats - Sushi restaurant - European restaurant - Library - Café

The work consists of all finishing and electro-mechanical works of a 13 floors building in center of Damascus.

The works consists of constructing Core and shell of 35 Villas ( 16200 m²).